Send Message
SUZHOU SHENHONG IMPORT AND EXPORT CO.,LTD
products
products
Home > products > Overhead Line Construction Tools > 80KN - 180KN Overhead Line Construction Tools Two Bundle Conductors Running Board

80KN - 180KN Overhead Line Construction Tools Two Bundle Conductors Running Board

Product Details

Place of Origin: Jiangsu,China

Brand Name: shenhong

Certification: BV,CE,ISO

Model Number: SZ2

Payment & Shipping Terms

Minimum Order Quantity: 1 piece

Price: negotiation

Packaging Details: cartoon

Delivery Time: ten days after deposit

Payment Terms: L/C, T/T, Western Union

Supply Ability: 500 Piece/Pieces per Month

Get Best Price
Highlight:

hydraulic compression tool

,

hydraulic lug crimping tool

Application:
Line Construction
Rated Load:
80-180KN
Weight:
17-90kg
Applicable Tackle Width Of Wheel:
75-125mm
Color:
Yellow, Red, Ect.
Package:
Cartoon
Application:
Line Construction
Rated Load:
80-180KN
Weight:
17-90kg
Applicable Tackle Width Of Wheel:
75-125mm
Color:
Yellow, Red, Ect.
Package:
Cartoon
80KN - 180KN Overhead Line Construction Tools Two Bundle Conductors Running Board

80KN - 180KN Overhead Line Construction Tools Two Bundle Conductors Running Board

 

Application

It is designed to avoid torsion strain accumulation during line stringing. It is used for stringing two bundle conductors

 

Notes: Can be customized according to the specification of other stringing block.

 

Technical data of 80-180KN Overhead line construction tools two bundle conductors running board

Model Rated load(KN) Weight(kg) Applicable tackle width of wheel Features
SZ2-8 80 17 75 independent
SZ2-8A 80 19 100
SZ2-8B 80 19.5 110
SZ2A-8 80 90 100 poising sheave
SZ2A-8T 80 100 110
SZ2B-13 130 55 110 Independent
SZ2C-13 130 50 110
SZ2B-18 180 90 125

 

 

80KN  - 180KN Overhead Line Construction Tools Two Bundle Conductors Running Board 0

 

Shipment

1. The machine will be shipped in container

2. We will ship the products within one month normally after receiving the payment.

3. Stock is available for standard product.

 

Payment

1. We accept T/T and L/C.

2. Please send swift copy of T/T if you arrange payment by T/T

3. Please send us the L/C draft to us before issue L/C.