Send Message
SUZHOU SHENHONG IMPORT AND EXPORT CO.,LTD
products
products
Home > products > Tower Erection Tools > Tower Erection Tools Steel Wire Rope Lifting Pulley For Cable Pulling During Tower Erection

Tower Erection Tools Steel Wire Rope Lifting Pulley For Cable Pulling During Tower Erection

Product Details

Place of Origin: Jiangsu, China

Brand Name: SHENHONG

Certification: ISO

Model Number: LZH

Payment & Shipping Terms

Minimum Order Quantity: 2 sets

Price: negotiation

Packaging Details: carton

Delivery Time: 7 days after payment

Supply Ability: 500 set/sets per month

Get Best Price
Highlight:

tower gin pole

,

diesel concrete mixer

Sheave Number:
1,2,3
Rated Load(KN):
5-80
Weight(KG):
1.2-6.5
Application Of Wire Rope Diameter(mm):
5.7-18.5
Usage:
Hoisting
Application:
Power Condtruction
Sheave Number:
1,2,3
Rated Load(KN):
5-80
Weight(KG):
1.2-6.5
Application Of Wire Rope Diameter(mm):
5.7-18.5
Usage:
Hoisting
Application:
Power Condtruction
Tower Erection Tools Steel Wire Rope Lifting Pulley For Cable Pulling During Tower Erection

Tower Erection Tools Steel Wire Rope Lifting Pulley For Cable Pulling During Tower Erection​

 

 

Application

Aluminum Alloy Wire Rope Lifting Pulley is used for lifting.It can be used in single, it also can be used as a block.

 

Characteristics

1. Material: Aluminum alloy

2. The type of Single wheel is open hook type.

3. The type of double wheel or third wheel is closed loop type.

3. It is made of aluminum alloy

4. Light weight

 

Technical Data

Model Number

Rated

Load(KN)

Sheave

Number

Application of

wire rope

diameter(mm)

Weight(KG)
LZH5-1K 5 1 5.7 1.2
LZH10-1K 10 1 7.7 1.5
LZH10-2 10 2 5.7 1.75
LZH10-3 10 3 5.7 2
LZH15-2 15 2 7.7 2
LZH15-3 15 3 12.5 2.75
LZH20-1K 20 1 11 2
LZH20-2 20 2 7.7 2.5
LZH20-3 20 3 7.7 2.75
LZH30-1K 30 1 12.5 3.5
LZH30-2 30 2 11 4
LZH30-3 30 3 7.7 4.2
LZH50-1K 50 1 15.5 4
LZH50-2 50 2 12.5 4.5
LZH50-3 50 3 11 4.75
LZH80-1K 80 1 18.5 6
LZH80-2 80 2 15.5 6.5

 

Tower Erection Tools Steel Wire Rope Lifting Pulley For Cable Pulling During Tower Erection 0